PG&E Phases Out SF6 in HV Substation GIS | T&D World leak test is performed on each bagged joint or flange after 24 hours has elapsed. Without significantly disturbing the bag, a small incision is made above the pocket. The nozzle of the SF 6 detector is inserted into the small incision and fed into the pocket at the bottom of the bag (Figure 1).